CALL FOR PROPOSALS
Terms of Reference: STE for event production services for DOST RSTW 2025
Published by Mary Ruth Ochavillo on MARCH 25, 2025.
DESCRIPTION OF ASSIGNMENT
The Short – Term Expert (STE) or Service Provider shall provide event production services, including sound, lighting, installation of a mega tent, stage, stage design, LED walls, and live streaming services for the 2025 Regional Science, Technology, and Innovation Week (2025 RSTW), scheduled for April 23 – 25, 2025.
KEY ASSIGNMENT OF THIS ASSIGNMENT
The STE or Consulting Firm’s scope of work will include, but is not limited to:
- Provide a professional and technically sound production environment.
- Create a visually appealing and functional event space through the installation of a mega tent, stage, and LED walls.
- Ensure the timely and efficient installation and operation of all equipment and infrastructure.
- Deliver high – quality sound, lighting, visual experiences, and live stream for attendees and remote audience.
- Adhere to the event’s overall theme and branding guidelines.
- Adhere to all safety regulations and best practices
DURATION, LOCATION OF ASSIGNMENT
Schedule of Assignment
No. of man-days: 5 man-days
Start of event: April 23, 2025
End of event: April 25, 2025
(Pre – event planning meetings, compliance to permitting requirements, Ingress, Egress, Post – Event meeting)
Assigned Location
- • Ground Floor, Corte Garden Activity Center, Ayala Malls Central Bloc
• 3rd Floor, Padriga Bridgeway, Ayala Malls Central Bloc
• 3rd Floor, Geonzon Bridegeway, Ayala Malls Central Bloc
• 5th Floor, Sinamay 1 & 2, Seda Central Bloc Cebu
CATEGORY
Short-term Expert (STE)
PROPOSED EXPERT/S
The supplier must demonstrate:
- Proven experience in providing similar services for events of comparable size and complexity.
- Established portfolio of previous work showcasing high – quality sound, lighting, mega tent & stage installation, LED wall, and live streaming services.
- A team of qualified and experienced technicians and engineers.
- Commitment to safety and adherence to industry standards.
- Knowledge of local regulations and permitting requirements.
EXPERT’S TASKS
STE or Service Provider’s scope of work will include but is not limited to:
1. Pre – Event Planning Meetings
• Participate in coordination meetings with AFOS Foundation and DOST 7 to discuss the event flow, align expectations, and finalize ingress, egress, and permit requirements.
2. Mega Tent Installation
• Supply and install a mega tent at the Ground Floor, Corte Garden Activity Center of Ayala Malls Central Bloc, with measurements as agreed with AFOS Foundation & DOST 7.
• Ensure the tent is structurally sound and weather – resistant.
• Provide appropriate flooring, climate control (heavy duty air coolers), and necessary safety measures.
• Include setup and dismantling of the tent.
3. Stage Construction and Design
• Design and construct a stage suitable for the event.
• Provide a visually appealing and functional stage design that aligns with the event theme.
• Supply all necessary stage elements, including LED walls, risers, platforms, tables, and chairs.
• Ensure the stage is safe and accessible.
4. Sound System
• Provide a professional – grade sound system capable of delivering clear and consistent audio throughout the venues.
• Include microphones, speakers, mixing consoles, and other necessary equipment.
• Provide a qualified sound engineer to manage the system during the event.
• Conduct sound checks and ensure optimal audio quality.
5. Lighting System
• Design and implement a dynamic and visually engaging lighting system.
• Supply all necessary lighting fixtures, controllers, and rigging equipment.
• Provide a qualified lighting technician to operate the system during the event.
• Create lighting effects that enhance the event atmosphere.
6. LED Walls
• Provision and installation of high – resolution LED walls for displaying presentations, videos, and graphics.
• Content management and display during the event.
• Ensuring seamless integration of LED walls with other audio – visual elements.
• Provision of a qualified LED wall technician.
• Proper cabling, and power management with a qualified electrician.
7. Live Streaming (Opening Ceremonies and Closing Ceremonies)
• Provision of a professional live streaming setup, including cameras, encoders, and streaming software.
• Multi-camera setup with professional video switching.
• High quality audio capture and integration with the live stream.
• Live streaming to the specified online platform (e.g., Facebook Live, YouTube).
• Recording of the live stream for post – event use.
• Provision of a live stream technician.
• Provision of a graphics package for the livestream, including lower thirds and overlays.
• Provision of a dedicated and stable internet connection with sufficient upload speed.
8. Installation and Dismantling
• Manage the complete installation and dismantling of all equipment and infrastructure.
• Ensure all installations are completed within the agreed – upon time frame.
• Leave the venue in its original condition after dismantling.
9. Technical Support and Coordination
• Provision of a dedicated Project Manager to oversee all technical aspects of the event.
• On – site technical support throughout the event,
• Coordination with other event suppliers and stakeholders.
• Development of a detailed technical plan and schedule.
• Provision of backup equipment and contingency plans.
10. Safety and Compliance
• Adhere to all relevant safety regulations and industry best practices.
• Provide necessary safety equipment and personnel.
• Obtain necessary permits and approvals.
11. General Terms and Conditions
• The supplier will be responsible for obtaining all necessary permits and licenses.
• The supplier deploys their qualified electricians/engineers to guarantee compliance standards.
• The supplier will comply with all applicable safety regulations.
• The supplier will be responsible for any damage to property caused by their equipment or personnel.
• AFOS Foundation and DOST 7 retain all rights to the live stream content and videos captured by the supplier
KEY DELIVERABLES/S
The STE or supplier will deliver:
- A detailed technical proposal outlining the proposed equipment and services.
- A comprehensive technical plan and schedule
- High – quality sound, lighting, mega tent & stage installation, LED walls, live streaming services
- On – site technical support throughout the event.
- Recorded live streaming files.
- Compliance to necessary permits and approvals.
- A post – event report summarizing the technical aspects of the event
REPORTS
The STE shall submit the following report:
- Work Plan
- Recorded live streaming files – Deadline: April 29, 2025
- Post – Event Report on the technical aspects of the event
- STE Time Sheet
PROPOSAL SUBMISSION
Interested Short-Term-Expert or Consulting Firms are requested to submit the following before 11:59 PM on March 26, 2025.
- Company profile and experience.
- Detailed description of the proposed equipment and services.
- Technical specifications for sound, lighting, stage, LED walls, and live streaming.
The proposals with the required documents enumerated above should be addressed and emailed to:
YVETTE HOPE P. LABUS
Project Manager & Philippine Resident Representative
AFOS Foundation for Entrepreneurial Development Cooperation
Email address: info-ph@afosfoundation.org
The selection of the Short-Term-Expert or Consulting Firm will be based on the following criteria:
- Experience and expertise
- Technical capabilities
- Quality of proposed equipment and services
- Optimal balance of cost and quality
- References and past performance
- Timeline and logistics